Author Topic: Building a 1BBL electric system  (Read 322 times)

Offline kw642

  • BeerSmith Master Brewer
  • ****
  • Posts: 67
Building a 1BBL electric system
« on: November 26, 2020, 09:09:36 PM »
Hi everyone,

If you have any advice and/or pictures relating to building a 1BBL electric brewery I'd love to hear from you - especially if it pertains to putting together a control panel and a mash tun.  At this point, I have three 5500W ripple elements, three NEMA 5-15 cords (plugs on one end, other end is somehow supposed to wire up to the elements), and that's it!  I came across Black Friday deals on PIDs on Amazon but I have no idea which one I need or how many.

Thanks for any info you're able to share

 

modification