First, thank you Brad for the Tilt readings import function and the dry hop enhancements! I have tried both functions and they are great.
I do have one suggestion for the dry hop function ... now that we can enter dry hop duration as well as start date based on certain parameters, it would be nice if the actual calendar date for each addition could be shown on the brew steps report. For example, if my primary starts on Dec 1, and my dry hop additions are done 5 days and 10 days after primary starts, the report would show me that hop "A" needs to go in on Dec 5, and hop "B" needs to go in on Dec 10. This would be similar to the way the primary fermentation start date and the bottling dates are currently shown in the report.
I do have one suggestion for the dry hop function ... now that we can enter dry hop duration as well as start date based on certain parameters, it would be nice if the actual calendar date for each addition could be shown on the brew steps report. For example, if my primary starts on Dec 1, and my dry hop additions are done 5 days and 10 days after primary starts, the report would show me that hop "A" needs to go in on Dec 5, and hop "B" needs to go in on Dec 10. This would be similar to the way the primary fermentation start date and the bottling dates are currently shown in the report.